Ride Stats |
Time: 01:27:16
|
Route:
Swamp Rabbit Trail
|
Distance:
18.60 miles
|
Avg Speed:
12.79 mph
|
Max Speed:
0.00 mph
|
Altitude Gain:
0 ft
|
Terrain: Road: Rolling
|
Bike: Gary Fisher Rail Road
|
Club: Clydesdales |
Weather Conditions: |
|
Today I headed toward town on East North Street but turned onto Laurens Road to go through Cleveland Park. I caught the Swamp Rabbit Trail in the Park and went up the Hincapie trail, then back through the park to see the work being done on the new bridge across the Reedy River. I got off the trail at McDaniel Street and took back streets through town and caught the trail again at River Street. I followed it out to the closed art at Brammet Street and went around to Washington Street and back on the trail. I followed the trail out to the old railroad car at Sulphur Springs Road then turned back and went home like I normally do. The road was pretty slow as there were a ton of walkers (baby and dog) in Cleveland Park and a clog of bikers stuck at the closed section of the trail trying to figure out what to do. I have two street paths that I take around the closed section but neither is very child friendly to ride on, so I couldn't make a good recommendation to them. The ride was a little jumbled but overall I enjoyed it.
0 member views | 5815 total views
report problem |
|
|
|
My Recent Threads |
10/9 - Ride, Calendar, and Journal
8/28 - Blog Views?
12/26 - 2019 Goals!
|
|