Ride Stats |
Time: 02:57:58
|
Route:
Swamp Rabbit Trail
|
Distance:
34.76 miles
|
Avg Speed:
11.72 mph
|
Max Speed:
32.70 mph
|
Altitude Gain:
1,104 ft
|
Terrain: Road: Hills
|
Bike: Surly Straggler Touring
|
Club: Clydesdales |
Weather Conditions: Clear sky, 73°F, Feels like 69°F, Humidity 43%, Wind 8mph from ESE - by Klimat.app |
|
This morning I took the Surly from home and rode through Cleveland Park and Falls Park then on to Hudson Street where I stopped to take a picture of the new bridge that will be in Unity Park. Then I headed to the prescribed detour, but found Mayberry Street closed for work on a power line. I turned back on Hudson and wandered around until I hit Washington then wandered to the Hampton Avenue bridge. I went by Hampton Station and followed Hampton Avenue between the new apartments and Mt Calvary. I got back on the trail just below the Swamp Rabbit Cafe. From there I followed the trail to the north end then turned back and rode into TR and stopped at the TRee House fora decaf au lait and a spicy peachy chicken sandwich. Kristen was just finishing her art camp, Gene was in the kitchen, Reagan was Barista, while Rachel and a new oriental girl ran the counter and cleaned around the shop. Then I rode back down the trail. Mayberry was still closed, so I went up the hill and crossed the rail lines at the Old Queen street Bridge. I went back to the trail at Hudson then crossed the walk bridge that took me to Falls Street. Then I took my normal route home.
www.strava.com/activities/5486207445
0 member views | 4184 total views
report problem |
|
|
|
My Recent Threads |
10/9 - Ride, Calendar, and Journal
8/28 - Blog Views?
12/26 - 2019 Goals!
|
|